Veolia Water - Staines

The redevelopment of the existing building alongside the construction of the new office block allowed for a mix of high performance facade and slimline windows that needed to replicate sight lines required in the planning permission.

Purpose designed and fabricated bull nose feature columns to the façade ensured the architects vision and requirements was met.

Main Contractor
Merit Merrell Technology
Architect
Vincent & Gorbing Architects
Requirement
Curtain walling, stair towers, window and doors.
Solution
Schuco FW50+ Curtain Walling incorporating Pilkington Suncool HP Neutral 70/40 double glazed units with Argon gas filled cavities. Schuco RS 50 windows and Schuco RS 60 doors. Bullnose aluminium feature pressing between ribbon windows.