Units 26-27, Cambridge Science Park

Unit 26 - 27 is an office development on the site of two previous buildings, which were demolished to make way for the development.

The project was developed to CAT A standard and will be occupied by science led tenants that meet the Science Park’s occupation criteria.

Prism were appointed to provide the external façade to this project.

Main Contractor
SDC Builders
Architect
Scott Brownrigg
Requirement
Double glazed curtain wall units, entrance screen incorporating automatic doors, external aluminium fins, internal fire rated curtain walling and aluminium metalwork.
Solution
Curtain Wall System: Wicona Wictec 60, Door System: Wicona Wicstyle 65, Automatic Doors: Geze Bi-Parting Doors, Fire Rated Curtain Wall System: Wicona Wictec 60 FP (G30), Fire Rated Door System: Wicona Wicstyle 77 FP (E30), Glass: 6mm Heat Strengthened Ipasol 62/29 Ultraselect, 6mm Heat Strengthened S1 Plus Low-e & 8.8mm Pilkington Optilam Clear Float Laminate (4/0.76pvb/4).
Value
£4.0M